Your basket is currently empty!
Category: Uncategorized
Day 7 Toilet Extension
Smaller dumper arrive to move quarry waste (or whatever it is called nowadays) inside and outside the footings. A busy day in the pouring rain with vehicle tracks much in evidence.
Day 6 Toilet Extension
Good progress. Connection made to foul drain.
Day 5 Toilet Extension
Walls started for the bit under the floor.
Day 4 Toilet Extension
Day 3 Toilet Extension
Heckishly big footings for a little loo! Now waiting for building control. I hope the inspector does not want them any deeper!